North Wave 1
North Wave 1 is currently positioned in West Africa off the coast of Guinea and at times off the coast of Sierra Leone, depending on operational requirements, loading Bulk commodities such as Bauxite or Iron ore fines.
North Wave 1
Self-propelled Crane barge, built in China, mounted with 2 Cranes, SWL 35 tons each at 35 metre outreach and SWL 30 tons each at 38 metre outreaches, capable of Loading Newcastle max Vessels Offshore. Primary objective and capability is to load Bulk commodities at offshore locations, from barges or coasters on to Capsize vessels.
North Wave 1
North Wave 1 is currently on a long-term Charter to serve Mining entities in West Africa, through dedicated Charterers (Adhira Shipping & Logistics DMCC) who have extensive experience on operations in this region
Multi-purpose Utility Tug - WGM 209
WGM 209 (TBRN WHS 201), Jiangsu China Primary objective is to use this highly manoeuvrable and versatile Tug, with a Bollard pull of around 50 tons and an open deck space of around 280 sq metre, capable of carrying up to 48 persons, for prospects around the Middle east and Arab Gulf areas. We are currently being vetted for suitability of service to Ms. Zaker Marine International (ZMI) for eventual use by ADNOC in Abu Dhabi.
Plans for further asset Ownership/Operation for WHS Shipping DMCC
Charter in PB 282 – Multipurpose Utility Tug, 28-ton Bollard pull to be delivered to the region upon completion of a pre-assessment for suitability for Charterer (ZMI/ADNOC). Expect to be delivered to the region in the next 3 to 6 months.
Plans for further asset Ownership/Operation for WHS Shipping DMCC
Crane Barges with dedicated Towing tugs – (TBN – North Wave 2 and North Wave 3) Each Crane barge to be mounted with one new Liebherr CBG 360 Crane along with suitable SMAG/PEINER (15 cu metre) grabs – SWL 36 metre at 36 metre outreaches. Intention is to position both Crane Barges within the next 12 months for projects in West Africa, similar to the North Wave 1, to load Bauxite or other similar Bulk Commodities .
Plans for further asset Ownership/Operation for WHS Shipping DMCC
Commercial Contracts for these 2 units are ongoing, post which the construction and commissioning is expected to take around 9 months, which should therefore position them in West Africa around Aug/Sept 2025.
Plans for further asset Ownership/Operation for WHS Shipping DMCC
Charter in PB 282 – Multipurpose Utility Tug, 28-ton Bollard pull to be delivered to the region upon completion of a pre-assessment for suitability for Charterer (ZMI/ADNOC). Expect to be delivered to the region in the next 3 to 6 months.
Plans for further asset Ownership/Operation for WHS Shipping DMCC
Charter in PB 282 – Multipurpose Utility Tug, 28-ton Bollard pull to be delivered to the region upon completion of a pre-assessment for suitability for Charterer (ZMI/ADNOC). Expect to be delivered to the region in the next 3 to 6 months.